Page 379 - Practical Power System and Protective Relays Commissioning
P. 379

Required  Days





                   Duration  Days  A 1 B  5  A 1 B  5  A 1 B  5  A 1 B  5  A 1 B  5  A 1 B  2  A 1 B  4  A 1 B  3  A 1 B  4




                   Labor  1  1    1         1         1    1    1  1   1


                   Technician  1  1  1      1    1    1    1    1  1   1





                   Engineer  1         1    1





                                            charging  and  circuit


                                            spring    VT  and
                                  mechanism  or  system  CT  of  CTs  of




                         gas      breaker  GIS   test  resistance  curve  check
                         SF 6          of   hydraulic      measurement  CT  ratio
                         of  GIS  circuit  pressure  or  block     of  VT’s
                         check  for  test  for  gas  compressor  CB/S  of  pressure  insulation  of  point  earthing  resistance  VTs  characteristic  and  test


               (Continued)  Activity  content Moisture  leakage  gas  leakage  oil  or  low  of  trip  air  of  discharging  oil  or  air  Measurement  of  confirm  winding  for  test  Excitation  High-voltage





               23.1          SF 6  Air  Inter  Test  and  Low  DC  Kick
               TABLE  Number  6.6  6.7  6.8  6.9  6.10  6.11  6.12  6.13  6.14  6.15  6.16