Page 377 - Practical Power System and Protective Relays Commissioning
P. 377

(Continued)


                          15                  30


                                                 A 1 B  2  A 1 B  3  A 1 B  4  A 1 B  5  A 1 B  5
              1  2  1        C  5  C  5  3  C  5



                             1    1              1              1    1





              1  1  1        1    1   1   1      1    1    1    1    1




              1  1  1        1    1   1   1           1    1

                             of
                    PF
                    voltmeters  operation  of              auxiliary



                 tests       angle    relays               and  spring  trip  and
                 primary  ammeters,  transducers  check  EF  and  circuit  main  switch,  CB  alarm

                 and  meters  and  SWG  and  O/C  the      earthing  or  CB  of  for  switch
                 secondary  for  test  meters,  11 kV  relays  EF  and  of  operation  isolator,  switch

              relay   MVAR   and      differential  test  measurement  pressure

              EF  protection  injection  MW,  control  OC  element  relays  trip  and  500 kV  CB  of  of  test  pressure  gas
              Transformer  Busbar  Secondary  meters,  and  Relays  Directional  directional  EF  and  OC  Transformer  Scheme  test  GIS  Resistance  test  Time  Operation  contacts  air  of  Test  SF 6  of  Test








              5.8  5.9  5.10  5.11  5.12  5.13  5.14  5.15  6  6.1  6.2  6.3  6.4  6.5
   372   373   374   375   376   377   378   379   380   381   382