Page 408 - Practical Power System and Protective Relays Commissioning
P. 408

396  Index


            Time scheduling and resource planning of  vector group of three-phase transformer,
                 commissioning of substations, 19  56f,57f
            Time setting multiplier (TMS), 195  vector group test, 60 61, 61f
            Time/current grading principles  Transient performance CT (TP CT), 113 115
              current, discrimination by, 203  TPS Class, 113
              current and time, discrimination by, 204  TPX Class, 113
              time, discrimination by, 203     TPY Class, 113 114
            TL. See Transmission line (TL)     TPZ Class, 113 115
            TM. See Time multiplier (TM)     Transient stability
            TMS. See Time setting multiplier (TMS)  limit, 40
            Total current, 64 65               of synchronous generators, 40
            Towers, 69                       Transmission line (TL), 69, 191 192, 210,
            Toxic arc byproducts, 91              216
            TP CT. See Transient performance CT (TP  autoreclosing for, 232 234
                 CT)                           high voltage DC power systems
            Transactors, 115                      transmission, 78 83
            Transformer protection, 269 270, 294  overcurrent protection, 282 283
              Buchholz protection, 272 273     overhead AC lines, 69 70
              comparison of high-and low-impedance  testing and commissioning of extra-high-
                 differential protection, 279     voltage and high-voltage cables,
              differential protection, 273 275    72 78
              examples of transformer differential  underground cables, 70 72
                 protection connections, 279  Transmission system, 1
               Dy11 transformer differential protection,  Transport control protocol (TCP), 180t, 183
                 280f                        Transportation, 58
               Y y0 auto-transformer differential  Trip
                 protection connections, 280f  logic of relay, 238, 241f
              IED, 198 199                     test, 354 355
              system earthing, 277 279         time test, 346
              testing and commissioning        trip-free CB feature, 93
               primary injection test, 347 349, 348f  Turbogenerators, 35 36
               secondary injection tests, 344 347  Two-winding transformers, 275 277, 277f
               transformer differential protection, 344  sequence impedances, 166, 167f
              zero-sequence circuits of transformers,
                 275 277
            Transformer(s), 2                U
              construction, 49 50            Unbalance effects on zero-sequence
              cooling system, 50 51, 52t          protection, 233
              differential protection, 367 368  Unbalance protection, 250
              earth fault protection, 272    Unbalanced phasors, 165
              efficiency, 63                 Undercurrent relay, 323
              impedance, 51                  Underfrequency protection, 247
              inrush current, 270            Underground cables, 70 72
              oil breakdown test, 64           high-voltage cables, 72
              overcurrent protection, 271, 283 284, 283f  Underreach scheme, 221 222
              overload protection, 271       Unearthed systems, 279
              percentage impedance, 166, 167f  Unit power factor, 205
              storage, 58                    Unit protections, 260 261
              theory, 51 58, 53f               application of differential protection,
               and overexcitation, 56 58          262
               three-phase power transformer   balanced circulating current system, 261f
                 connection vector group, 55f  balanced voltage system, 262f
   403   404   405   406   407   408   409   410   411