Page 60 - Process simulation and control using Aspen
P. 60

INTRODUCTION AND STKPWISE ASPEN PLUS       SIMULATION      53


                        Wet
                   Temperature = 75DC
                   Pressure = 1 aim                                      AiROur;
                   Flow rates
                   S 02 = 800 Ib/hr
                    (
                   H20 = 5 Ib/hr               WET
                                                         0
                        Air
                                               AIR
                   Temperature = 200oC
                   Pressure = 1 atm
                                                                          dry;           O
                   Flow rates = 50 Ibmol/hr
                   N2 = 80 mole%                           DRYER
                   O, b 20 mole%

                                       FIGURE 1.70  A flowsheet of a dryer


                                            REFERENCE

          AspenTech Official Site, When was the Company Founded?, http://www.aspentech.com/
             corporate/careers/faqs.cfm#whenAT.
   55   56   57   58   59   60   61   62   63   64   65