P. 219

STEP 8: DOCUMENTATION AND DEVELOPMENT OF THE DEPLOYMENT PLAN                  197



                    2.2 Recommendation and Approved Alternatives
                    List the approved alternatives and attach the feasibility analysis sheet with all approval
                    signatures.


                    Section 3. Assumptions, Dependencies, Constraints

                    3.1 Assumptions
                    Describe the assumptions about the current capabilities and use of the program when
                    it is released to production.


                    3.2 Dependencies
                    Describe the dependencies that can affect the deployment of the program.


                    3.3 Constraints
                    Describe factors that limit the ability to deploy the program.


                    Section 4. Operational Readiness

                    4.1 Site Preparation
                    Describe the preparation required for the site on which the system will operate. Define
                    any changes that must occur to the operational site and specify features and items that
                    should be modified to adapt to the new product. Identify the steps necessary to assist
                    the customer in preparing the customer’s designated sites for installation of the accepted
                    programs.


                    4.2 Assessment of Deployment Readiness
                    Describe the method for use in assessing deployment readiness.


                    4.3 Product Content
                    Identify the configuration audits and reviews to be held after a product is tested and
                    accepted and before the product is installed in the production environment.


                    4.4 Deviations and Waivers
                    Provide additional information regarding any waivers and deviations from the original
                    software requirements specification.


                    Section 5. Timeline for Implementation

                    Describe activities for a phased function rollout or a phased user base rollout.


                    Section 6. Training and Documentation

                    6.1 Training
                    Describe the plans for preparing and conducting training for the purpose of training
                    all stakeholders on the use of the product.


                    6.2 Documentation