Page 210 - TPM A Route to World-Class Performance
P. 210
TPM for equipment designus and suppliers 187
I LOSS AREA1 I KNOWLEDGE BASE STANDARD I
Construction
Equipment Weadcondition
Procadprecision
Tempohate
/ capacity level
Accesdlmation
Operating
conditions
Optimum
conditions
support functions
Ease of control/
standardization
Quallty of work
Error-proofing
Training skill
Figure 9.9 Inputs to the knowledge base to aid standards setting
9.6 Checklists
The knowledge base should contain checklists such as those below to guide
progress through the TF’M (D) milestones.
Effe c five design/spe cifica fion
Can the item of equipment be ehated? (Is it vital to the process or as
a result of the design?)
Can the item or part be integrated with the adjacent part?
Can the item be simplified? (Can it be a standard part rather than a
special one?)
Can we standardize the item with another item?