Page 206 - TPM A Route to World-Class Performance
P. 206

TPM for equipment designers and suppliers  183


                        Operational reliability Tolerance to conditions; simple manipulation; ease
                        of  maintenance
                        Lifetime costs
                   All this is a part of  continuous improvement.























                                 TPM cocus
                                          0 Ramp up to flawless operation.
                                          0 Stabilizatiodchmnic loss deffition.
                                          0 Optimizatiodcontroled decline.
                                          0 Rapid decommissioning.
                                          0 Lifecycle cost reduction (not shown).
                   Figure 9.3 What can TPM(D) delimr?



                              100%






                               67%
                       Total
                       lifetime   50%        Construction specification   b
                       cost of
                       equipment
                       (purchase,
                       Use,
                       maintenance,
                       disposal)
                                                          Construction  Testing   Full
                                                                 I        operation
                                       1      2      3       4       5      6
                   Figure 9.4  Early equipment management leads to greater cost control andjawless operation
   201   202   203   204   205   206   207   208   209   210   211