Page 355 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 355

A S y s t e m a t i c V i e w o f G r e e n a n d M i n i m u m P r o g r a m Re q u i r e m e n t s   317


                         Ease of Earning   Local Project   Probable Certification Level
                                           Experience
         Credit      Easy   Neutral  Hard  (% Earned)  Certified  Silver  Gold  Platinum
         SSc1                                  80
         SSc2 ∗                                60
         SSc3 ∗                                40
         SSc4.1 ∗                              50
         SSc4.2                                95
         SSc4.3                                80
         SSc4.4                                85
         SSc5.1                                30
         SSc5.2                                65
         SSc6.1                                95
         SSc6.2                                65
         SSc7.1                                80
         SSc7.2                                80
         SSc8                                  45
         WEc1 †        (2)                     85(2)     (2)
         WEc1 †               (4)              45(4)                     (4)
         WEc2                                  95
         WEc3 †        (2)    (3)     (4)    50(3)       (2)             (3)    (4)
         EAc1 †        (5)    (10)    (18)  50 (10)      (5)      (8)    (12)    (18)
         EAc2 †               (3)     (7)  50 (3)                 (3)    (5)    (7)
         EAc3                                  60
         EAc4                                  65
         EAc5                                  15
         EAc6                                  25
         MRc1.1 †             (2)              60(2)              (2)
         MRc1.2 ∗                              40
         MRc2 (50%)                          100
         MRc2 (75%)                            60
         MRc3 (5%)                             55

        TABLE 8.1.1  Example of Three Types of Ranked List of Credits for Initial Estimates (LEED 2009). This
        list is an example only and should be appropriately altered based on local experience (Continued)
   350   351   352   353   354   355   356   357   358   359   360