Page 50 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 50
Pts 2.2 Major Comments EP Pts 2.2 EP Pts 2009 2009 has additional 1 1 1 restrictions to protect or restore >20% of total site area for one point and >30% for EP point. Sites with both Greenfields and previously developed areas should follow requirements for each case. − 1 1 1 2009 has EP point for plan to − 1 1 capture and treat stormwa
Pts 2009 1 1 1 1 1 1 1 26
Subcategory 2.2 SSc5.1: Site Development— Protect or Restore Habitat SSc5.2: Site Development— Maximize Open Space SSc6.1: Stormwater Design—Quantity Control SSc6.2: Stormwater Design—Quality Control SSc7.1: Heat Island Effect— Non-roof SSc7.2: Heat Island Effect—Roof SSc8: Light Pollution Reduction Total
Subcategory 2009 SSc5.1: Site Development— Protect or Restore Habitat SSc5.2: Site Development— Maximize Open Space SSc6.1: Stormwater Design—Quantity Control SSc6.2: Stormwater Design—Quality Control SSc7.1: Heat Island Effect— Non-roof SSc7.2: Heat Island Effect—Roof SSc8: Light Pollution Reduction TABLE 2.0.0
32