Page 50 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 50

Pts 2.2 Major Comments EP Pts 2.2 EP Pts 2009  2009 has additional   1  1  1 restrictions to protect or  restore >20% of total site  area for one point and >30%  for EP point. Sites with both  Greenfields and previously  developed areas should follow  requirements for each case.  −  1  1  1  2009 has EP point for plan to   −  1  1 capture and treat stormwa

          Pts 2009  1          1      1       1      1      1    1               26







          Subcategory 2.2  SSc5.1: Site   Development—  Protect or Restore   Habitat  SSc5.2: Site   Development—  Maximize Open Space  SSc6.1: Stormwater   Design—Quantity  Control  SSc6.2: Stormwater   Design—Quality  Control  SSc7.1: Heat Island   Effect—  Non-roof  SSc7.2: Heat Island   Effect—Roof  SSc8: Light Pollution   Reduction  Total










          Subcategory 2009  SSc5.1: Site   Development—  Protect or Restore   Habitat  SSc5.2: Site   Development— Maximize Open Space  SSc6.1: Stormwater   Design—Quantity  Control  SSc6.2: Stormwater   Design—Quality  Control  SSc7.1: Heat Island   Effect—  Non-roof  SSc7.2: Heat Island   Effect—Roof  SSc8: Light Pollution   Reduction  TABLE 2.0.0










         32
   45   46   47   48   49   50   51   52   53   54   55