Major Comments 2009 has additional restrictions to protect or restore >20% of total site area for one point and >30% for EP point. Sites with both Greenfields and previously developed areas should follow requirements for each case. − 2009 has EP point for plan to capture and treat stormwater beyond requirements. See SSc6.1 for 2009 EP point. T
EP Pts 2.2 1 1 − − 1 1 − 7
EP Pts 2009 1 1 1 1 1 − 7
Pts 2.2 1 1 1 1 1 1 1 14 SS Summary Table of Major Differences between Versions 2.2 and 2009 and Associated Points (Pts) (Continued)
Pts 2009 1 1 1 1 1 1 1 26
Subcategory 2.2 SSc5.1: Site Development— Protect or Restore Habitat SSc5.2: Site Development— Maximize Open Space SSc6.1: Stormwater Design—Quantity Control SSc6.2: Stormwater Design—Quality Control SSc7.1: Heat Island Effect— Non-roof SSc7.2: Heat Island Effect—Roof SSc8: Light Pollution Reduction Total
Subcategory 2009 SSc5.1: Site Development— Protect or Restore Habitat SSc5.2: Site Development— Maximize Open Space SSc6.1: Stormwater Design—Quantity Control SSc6.2: Stormwater Design—Quality Control SSc7.1: Heat Island Effect— Non-roof SSc7.2: Heat Island Effect—Roof SSc8: Light Pollution Reduction TABLE 2.0.0