                13.   Install the  outboard  bearing isolator and ensure that the  drain slot
                     is located at the  bottom  (or 6  o'clock)  position.
                14.   Install  a new  'O'  ring  on  the  outside  of the  bearing  cap  and  coat
                     the  O.D.  with oil.
                15.   Coat  the  internal  surfaces  of  the  bearing  housing  with  oil  and
                     install the  shaft assembly into the housing.
               16.   Once  again, check to  ensure  that the  shaft is free to turn.
               17.   Tighten  the  bolt fasteners through  the  bearing cap to the housing
                     and hand  tighten.

               18.   Install the jacking bolts with locldng nuts  and hand tighten.

              12.8.1  Check shaft condition
               Support  the  bearing  housing  assembly  in  the  horizontal  position  and
               check the  following conditions.

                     Confirm  that  the  shaft  end  play  falls  within  the  limitations
                 ~
                     established for the particular  size of pump  and type of bearing.
                     With  the  impeller  threaded  onto  the  shaft,  confirm  that  the  shaft
                 .
                     run-out,  when  the  shaft is rotated  through  360 ~ , is no  more  than
                     a total indicator reading  of 0.002  inches.
                     By rotating the  shaft so that indicator rides along the housing face
                 .
                     fit throughout  the  360 ~ , ensure  that  the  total indicator  reading  is
                     no  more  than  0.001  inches.