Worksheet 54. Rolled Throughput Yield Analysis

                        RTY Capability (potential)

                        RTY Actual


                        Actual-Potential Gap


                        Project RTY Goal

                        Things to consider:
                           •   How large are the gaps among the actual RTY, the capability RTY, and the project’s
                              goal RTY?
                           •   Does actual process performance indicate a need for a breakthrough project?
                           •   Would we need a breakthrough project if we operated up to capability?
                           •   The RTY cannot be better than the lowest yield for all product features or process
                              steps. Use this fact to help allocate project resources. For example, would applying
                              SPC to a subset of CTx’s achieve the project’s goals at lower cost?

                                                           Notes: