Page 153 - The Six Sigma Project Planner
P. 153
Worksheet 54. Rolled Throughput Yield Analysis
RTY Capability (potential)
RTY Actual
Actual-Potential Gap
Project RTY Goal
Things to consider:
• How large are the gaps among the actual RTY, the capability RTY, and the project’s
goal RTY?
• Does actual process performance indicate a need for a breakthrough project?
• Would we need a breakthrough project if we operated up to capability?
• The RTY cannot be better than the lowest yield for all product features or process
steps. Use this fact to help allocate project resources. For example, would applying
SPC to a subset of CTx’s achieve the project’s goals at lower cost?
Notes: