Worksheet 56. Optimum Rolled Throughput Yields


                        RTY Optimum
                        RTY Actual


                        Actual-Optimum Gap

                        Project RTY Goal

                        Things to consider:
                           •   How large are the gaps among the optimum RTY, the actual RTY, and the project’s
                              goal RTY?

                           •   Would we need a breakthrough project if the process operated at optimum?
                           •   The RTY cannot be better than the lowest yield for all product features or process
                              steps. Use this fact to help allocate project resources. For example, would
                              optimizing a subset of CTx’s achieve the project’s goals at lower cost?
                                                           Notes:












































                                                             143