Page 334 - Trenchless Technology Piping Installation and Inspection
P. 334
Inspector Actions Inspect the liner condition and verify that the delivered material is not damaged nor has • prematurely exothermed before it is installed. The liner wet-out report should be reviewed and matched to the liner material and resin, • submitted by the contractor for the project. Reco
Liner material delivered on site Sample homeowner notification Preinstallation cleaning and CCTV inspection of the pipe Pipe plugging or bypassing Liner samples for testing Monitoring CIPP cure Inspector Action on Various Operations
Operation Traffic control TABLE 7.7
293