Page 334 - Trenchless Technology Piping Installation and Inspection
P. 334

Inspector Actions Inspect the liner condition and verify that the delivered material is not damaged nor has   •   prematurely exothermed before it is installed. The liner wet-out report should be reviewed and matched to the liner material and resin,   •   submitted by the contractor for the project. Reco








                          Liner material delivered on site  Sample homeowner notification  Preinstallation cleaning and  CCTV inspection of the pipe  Pipe plugging or bypassing  Liner samples for testing  Monitoring CIPP cure  Inspector Action on Various Operations








                       Operation                    Traffic control  TABLE 7.7