          1.6.2 Utility Tunneling
          In the utility-tunneling (UT) technique, the same process as conven-
          tional pipe jacking is used, except that in the utility-tunneling method,
          a temporary support structure (called a liner) is simultaneously con-
          structed as the excavation of tunnel proceeds. Normally, the support
          structure or liner is traditional tunnel liner plates (TLP) or steel ribs
          (SR) with wooden lagging (WL). After completion of the tunnel, pipe