Page 346 - Wastewater Solids Incineration Systems
P. 346
Appendix C
Determination of
Wastewater Solids
Incineration Related Costs
1.0 COMPOSITION OF 3.6 Maintenance by
WASTEWATER SOLIDS Plant Personnel 313
INCINERATION COSTS 308 3.7 Amortized Capital
2.0 STARTING POINT 308 Costs 313
3.8 Incineration Cost
3.0 STANDARD MULTIPLE-
Summary 315
HEARTH FURNACE SYSTEM
EXAMPLE 309 3.9 Wastewater Solids
3.1 Natural Gas 310 Management Costs 315
3.2 Electricity 310 4.0 BENCHMARKING-
3.3 Labor 311 COMPARISON WITH
3.3.1 Operators 312 INCINERATION COSTS AT
OTHER WASTEWATER
3.3.2 Overtime 312
TREATMENT PLANTS 315
3.3.3 Shift Manager 313
3.4 Scrubber Water 313 5.0 REFERENCE 318
3.5 Ash Disposal 313 6.0 SUGGESTED READINGS 318
The management of wastewater solids has always been an issue of concern for waste-
water treatment plants (WWTPs), especially because these costs substantially con-
tribute to the overall costs of operating and maintaining a WWTP. Moreover, many
utilities find it difficult to track all of the costs associated with wastewater solids
management. Representative utility-wide costs from which to benchmark operations
are difficult to find.
307