Page 174 - Acquisition and Processing of Marine Seismic Data
P. 174

2.6 QC IN DATA ACQUISITION                         165

              j. Navigation and positioning system:          analysis of source signal, acoustic ranging
                Navigation system description and            data analysis, rGPS data analysis.
                components (Fig. 2.16), system            n. Onboard processing: Software and hardware
                configuration, surface positioning/DGPS      systems available for onboard processing,
                and rGPS system (Section 2.1.7), streamer    flow and parameter tests, final deliverables.
                and source positioning (Section 2.3.2),   o. Data and shipments: Seismic data format
                acoustic ranging (Section 2.3.4),            description, navigation data format
                echosounder/gyro/currentmeter/ADCP.          description, list of original data tapes and
             k. Production summary: Primary time use of      contents.
                the survey (Fig. 2.107), daily production
                lengths (Fig. 2.108), cumulative production  2.6.5.6 HSE Report
                lengths (Fig. 2.109), average vessel speed  Health, safety and environment (HSE) man-
                (Fig. 2.110), line change times (Fig. 2.111),  agement is an integral part of marine seismic
                daily operations summary (Table 2.22),  operations  today.  Each  service  company
                postplot map, fold distribution maps    develops its own safety management and crew
                (flexed and unflexed).                  education/audit system to minimize the injuries
              l. HSE implementations: Meetings and drills,  onboard, especially during deck operations.
                vessel induction, safety events, incident  They periodically inform and educate the
                reporting, internal and external audits,  employees in terms of HSE implications, their
                helideck operations, work boat operations,  personal responsibilities, precautions that they
                marine mammal observations.             must take before the geophysical operations,
             m. Acquisition QC: Online QC monitoring,   procedures and instructions for emergency situ-
                offline QC analysis, analysis of seismic  ations, safety procedures for onboard activities
                data, navigation analysis and processing,  and operations to reduce possible hazards based






























           FIG. 2.107  Primary time use of the survey in hours and percentage, and overall production in kilometers.
   169   170   171   172   173   174   175   176   177   178   179