Page 318 - Advances in Renewable Energies and Power Technologies
P. 318
5. Economics of Hybrid PV/Batteries Bank/Diesel Generator System 291
Npv=64; Nbat=9; Pd=12.6kW
25
[Y VALUE]
Co 2 emission (kg) during the 36 h 15
[Y VALUE]
20
[Y VALUE]
10
0 5
1 1.5 2 2.5 3
case
FIGURE 8.25
Calculated CO 2 emission for minimum pollution analysis condition at different dod range
setting.
Npv=65, Nbat=6, Pd=11.5kW
20
17.901
18 17.511 14.923
CO 2 emission (kg) during 36 h 12 8 6
16
14
10
2 4
0
1 1.5 2 2.5 3
case
FIGURE 8.26
Calculated CO 2 emission for minimum cost analysis condition at different dod range
settings.

