196   CHAPTER 4 LINEAR PROGRAMMING APPLICATIONS


                                    Frandec’s production schedule calls for 5000 Liftmasters to be made next month. Frandec
                                    purchases the motors from an outside supplier, but the frames, supports and straps may
                                    either be manufactured by the company or purchased from an outside supplier.
                                    Manufacturing and purchase costs per unit are shown.


                                    Component                Manufacturing Cost             Purchase Cost

                                    Frame                         E38.00                       E51.00
                                    Support                       E11.50                       E15.00
                                    Strap                         E 6.50                       E 7.50



                                    Three departments are involved in the production of these components. The time (in
                                    minutes per unit) required to process each component in each department and the
                                    available capacity (in hours) for the three departments are as follows:


                                                                             Department
                                  Component                Cutting             Milling             Shaping

                                  Frame                       3.5                 2.2                  3.1
                                  Support                     1.3                 1.7                  2.6
                                  Strap                       0.8                —                     1.7
                                  Capacity (hours)          350                 420                  680


                                    a. How many of each component should be manufactured and how many should be
                                      purchased?
                                    b. What is the total cost of the manufacturing and purchasing plan?
                                    c. How many hours of production time are used in each department?
                                    d. How much should Frandec be willing to pay for an additional hour of time in the shaping
                                      department?
                                    e. Another manufacturer has offered to sell frames to Frandec for E45 each. Could
                                      Frandec improve its position by pursuing this opportunity? Why or why not?
                                13 The Two-Rivers Oil Company near Pittsburgh transports gasoline to its distributors by
                                    truck. The company recently contracted to supply gasoline distributors in southern Ohio,
                                    and it has $600 000 available to spend on the necessary expansion of its fleet of gasoline
                                    tank trucks. Three models of gasoline tank trucks are available.

                                                  Capacity      Purchase         Monthly Operating Cost,
                                  Truck Model     (gallons)       Cost            Including Depreciation
                                  Super Tanker      5 000        $67 000                 $550
                                  Regular Line      2 500        $55 000                 $425
                                  Econo-Tanker      1 000        $46 000                 $350



                                    The company estimates that the monthly demand for the region will be 550 000 gallons
                                    of gasoline. Because of the size and speed differences of the trucks, the number of
                                    deliveries or round trips possible per month for each truck model will vary. Trip
                                    capacities are estimated at 15 trips per month for the Super Tanker, 20 trips per month
                                    for the Regular Line and 25 trips per month for the Econo-Tanker. Based on





                Copyright 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s). Editorial review has
                      deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
   211   212   213   214   215   216   217   218   219   220   221