using the PFD in Figure 1.5 and the flow table given in Table 1.5.
A utility summary for all the equipment is given in Table E8.10, from which we find the total yearly utility
costs for this process:
Steam = $ 3,412,000/yr
Cooling Water = $ 165,000/yr
Fuel Gas = $2,771,000/yr
Electricity = $37,400/yr
Total Utilities = $6,385,000/yr
Raw Material Costs from the PFD, Table 8.4, and Example 8.8 are
Toluene = $53,927,000/yr
3
Hydrogen = $6,622,000/yr (based on a value of $0.118/std m )
Total Raw Materials = $60,549,000/yr
There are no waste streams shown on the PFD, so
Waste Treatment = $0.0/yr
From Example 8.2 the cost of operating labor is
Table E8.10 Summary of Utility Requirements for the Equipment in the Toluene Hydrodealkylation
Process