Page 338 - Applied Process Design For Chemical And Petrochemical Plants Volume III
P. 338

66131_Ludwig_CH11A  5/30/2001 4:49 PM  Page 297










                                                                Refrigeration Systems                                      297

                                                                                                Figure 11-11. Steam jet utilities require-
                                                                                                ments when producing 50°F chilled
                                                                                                water temperature. (Used by permis-
                                                                                                sion: ©Croll-Reynolds Company, Inc.)





























                                                                                                Figure 11-12. Steam jet utilities require-
                                                                                                ments when producing 60°F chilled
                                                                                                water temperature. (Used by permis-
                                                                                                sion: ©Croll-Reynolds Company, Inc.)




























                     Specification                                           1. Flexibility of operation desired as this determines the
                                                                               number of booster jets.
                                                                             2. Type of condenser: barometric, surface, or low-level jet.
                       Figure 11-13 is convenient for preparing an initial specifi-  3. Temperature extremes of cooling water for condenser
                     cation for competitive inquiry, as well as for summarizing  and duration of time for these temperatures.
                     the final accepted performance and specifications. In using  4. Closed or open circuit chilled water.
                     the specification sheet, supplemental notes should be   5. Discharge heads on chilled water pumps and conden-
                     included to state:                                        sate pumps, if manufacturer is to furnish.
   333   334   335   336   337   338   339   340   341   342   343