Page 19 - APPLIED PROCESS DESIGN FOR CHEMICAL AND PETROCHEMICAL PLANTS, Volume 1, 3rd Edition
P. 19
8 Applied Process Design for Chemical and Petrochemical Plants
-
L
m m.
12 Ib. of water vaporh.
*ace of noncondcns-
water obles.
13,075 Btu./hr.
,-Fatty acid
I 28OMW r F: A.distillate
1 IJlOlb.of vapor/hr. I 0.85 sp.gr.
I
c-l I 58 Ib.of liquid/hr. J - __ - LReflux
li Reboiler 527 E - (not required 1 950IbJhr.
1 134 gal./hr.
~301,400 /i for design I zero Btu./hr.
4
-
feed)
BtU./hr.
TCrude fotty acid 16mm.
feed - Product pump
J-4
1 0.85sp.gr. 4 Hg - 225 fi A. pitch
d
1 1.000 Ib./hr
\ 141 gal./hc gpm./ 0.71 W.gK
50ib./hr.
\ zero Btu./hr. I 0.14gpm.
\
Ot = ISOF: A 475 F. t 22.600 Btu./hr.
M
area, definitely influences decisions regarding the equip- A complete model usually includes piping, valves, lad-
ment layout on the ground, in the structures, and in rela- ders, floor grating, etc. This essentially completes the visu-
tion to buildings. Prevailing wind direction and any other alization of the condition of the layout. In fact, many engi-
unusual conditions should also be considered. neering offices use models to varying degrees and often
make direct space-clearance measurements from them.
The use of pictorial isometric or oblique views of plot
areas as shown in Figure 1-15 is very helpful for equip- Others photograph the models, or sections, for use by the
ment location evaluation. With talented personnel, this piping engineers at their desks. In some few instances,
type of layout study can replace model studies. These lay- dimensioned photographs have been issued directly to
outs are also useful for management presentations. construction forces in place of drawings.
The models are even more helpful to the process engi-
(b) Models, Figure 1-16A and 16B neer than simple plot plans. The advantages are multi-
Scale models are a real asset in the effective and effi- plied, as with models the process engineer can study as
cient layout and sometimes process development of a well as solicit the advice of other engineers in visualizing
plant. Although any reasonable scale can be used, the a processing condition.
degree of detail varies considerably with the type of Plant model costs vary depending upon the degree of
process, plant site, and overall size of the project. In some detail included. Considerable decision making informa-
instances cardboard, wooden, or plastic blocks cut to a tion can be obtained from a set-up of block layout only,
scale and placed on a cross-section scale board will serve and these costs would be extremely small. For a reason-
the purpose. Other more elaborate units include realistic ably complete scale piping detail model the costs are
scale models of the individual items of equipment. These reported5 as 0.1 to 0.6 percent of the cost of the plant.
are an additional aid in visualizing clearances, orienta- The large plants over $20 million cost in the lower 0.1 per-
tion, etc. cent range while small plant models cost in the 0.6 to 1.0