336                       Applied Process Design for Chemical and Petrochemical Plants










                                                       - E,
                                                       c
                                                       a8
                                                       .- e
                                                       L
                                                       0







                              0   6.3  10   20   30   40   50
                                  liquid rate (gpm/sq It)

                  A.  Gempak@ floodlng lines for Series AS.  Used by permis-   B. Gempak@ pressure drop, Series AS,  with 0.50-in.  crimp
                  sion of Glitsch, Inc.,  Bull. 5140.             height. Used by permission of Glitsch, Inc.,  Bull. 51 40.

























                             0.05
                              C-factor = VS[(pJ/(~yy)lM  (Wsec)


                  C. Gempak@ pressure drop, Series AS, with 0.375-in. crimp   D.  Gempak@ relative HETP. Used by permission of Glitsch,
                  height. Used by permission  of Glitsch, Inc.,  Bull. 5140.   Inc., Bull. 5140.
            Figure 957. For Example 98 typical Glitsch Gempap preliminary design charts for structured packing. Note: These plots ate to be used in
            carrying out the calculations described in the Glitsch bulletin. Graphic data presented hen? have been obtained in tests whose candtlons may
            differ materially from your own. Curves on these pages are for Gernpak with crimp angles of 45" from the horizontal, and should be sufficient
            for a preliminary review. The actual surface texture, which determines the final design, should be chosen in consultation with the Glitsch
            process engineering std. Used by permission of Glitsch, Inc.,  Bul. 5140.


            Hexigrid@ Style 2 High Capacity                       Flexignd@ Style 3 High Efficiency
                                                                                                      +
                                                                                                       .0009
                                                                  % flood@const L/V - 165.34 x (C.  + .06 a CL) (9- 73)
            %flood@constL/V-119x(CV +.074=+.00136C~)     (9-72)
                                  100 c,                             % flood@const L -    100 c,              (9- 73A)
            % flood@const L =                           (9 - 72A)                  .605 - .0464 ,& + ,0009 CL
                          .84 - .0676 ,& + .00136 CL
                                                                             Const - constant