112                                                                               Boiler Operator’s Handbook

               loads where it was the most efficient.               should never associate the number of pumps in opera-
                    Once Boiler three was installed, a necessity to  tion with the number of boilers. They deserve their own
               match increased plant load, the Operators chose to fire it  set of rules, established by experience and observation.
               alternating with a combination of Boilers one and two.     Many operators don’t realize that there’s a lower
               The significant discrepancy between those two operat-  limit to efficient operation of water softeners. Once the
               ing setups was obvious to the plant engineers and an  flow in a softener, or any ion exchange bed for that mat-
               investigation was conducted to determine what to do  ter, drops below a set value (usually 3 gpm per square
               about it. It was determined that the principal reason for  foot  of  flow  area)  they  begin  channeling.  The  water
               the difference was that Boiler three was equipped with  tends to bypass much of the resin and its capacity isn’t
               an economizer. Due to the age of the first two boilers  used. Operators can allow a lot of scale forming hard-
               a decision was made to purchase another new boiler  ness to sneak through their softeners if they run too
               with an economizer rather than installing economizers  many of them in parallel.
               on the older boilers. Part of the investigation included     If everyone in your plant is doing their best to con-
               generation of the graphs. Now the Operators know that  serve that valuable condensate you will have reduced
               for certain periods of operation including the Christmas  the demand for makeup water and may have reduced it
               shutdown it’s advisable to operate the oldest boiler be-  to the point that your softeners start channeling. You’ll
               cause it’s the most efficient for low steam loads.   have to watch the softeners closer if you’re down to one
                    Evaluation of the plant’s steam loads later led to  because it might start regenerating automatically when
               the decision to abandon, dismantle, and scrap Boiler two  you’re not looking. That will shut off your supply of
               because plant operations almost never produced steam  makeup.
               loads that were best served by that boiler and mainte-     Some plants are constantly having trouble with
               nance of it wasn’t economical.                       condensate loss. It’s either due to contamination indi-
                    This example should serve to prove to you that  cations or leaks. In those cases it’s better to have the
               knowing your load and knowing your equipment can  technician that services those softeners modify the
               make a significant difference in the cost of operation of  programming to limit the softeners on line unless the
               your boiler plant and a graphing your data helps make  pressure drop through them gets too high. It’s a mat-
               it evident. Decisions to simply alternate firing boilers  ter of adding a differential pressure switch so another
               without regard to load performance cost that manufac-  softener will come on line when needed. He should also
               turer hundreds of thousands of dollars.              add a bypass switch that permits you to manually put a
                    Now that you know your plant and know your  softener in service.
               load you will make decisions that reduce the impact      Whenever I visit a plant and find more than one
               on operating costs. Frequently operators will decide  piece of equipment operating I do a quick check of the
               to put another boiler on line whenever the load on one  loads to see if the loads and equipment match. I should
               approaches 70%. That immediately converts operating  note that this also applies to chillers and devices other
               conditions from one boiler operating at its maximum  than boiler systems. It is always a cheap way to give a
               efficiency to two boilers operating near minimum effi-  customer a return on his investment in my time because
               ciency at 35% load. Radiation losses are doubled with no  I can usually show a considerable savings for doing
               change in load and all losses associated with lower fir-  nothing but shutting off some of the operating equip-
               ing rates are encountered. Knowing the load, being able  ment.
               to forecast its changes, and knowing what your boiler     In mid summer of 2001 I visited a plant where the
               can do will frequently prevent putting that other boiler  gas booster was running constantly when the gas sup-
               on the line until the load will exceed 100% of what is  ply pressure was more than adequate to serve the boiler
               on line. Establish values based on experience and don’t  load. The owner had his operators shut the booster
               hesitate to experiment to see what the best matches are.  down and bypass it. Of course they had to check it when
                    Matching equipment to load isn’t restricted to the  the temperatures got colder to determine when they
               boilers. I don’t know how many plants I visit where  might need it. I encouraged them to establish an SOP to
               the scheme is to operate one boiler feed pump for each  check it out by running it temporarily every fall so they
               boiler on the line. Since feed pumps have to be capable  would be capable of putting it in service should they
               of delivering water at the boiler safety valve pressure  need it in the winter but, to the best of my knowledge,
               it’s not uncommon for them to have significant capacity  it hasn’t run since. That wasn’t just a case of matching
               relative to normal operating pressures. As a result you  load, it was a case of recognizing there was no load.