Page 94 - Boiler_Operators_Handbook,_Second_Edition
P. 94

Boiler Plant Operations                                                                              79


               recommend you go to the hardware store and get some  on the correct boiler, pull on it and let go of it. Repeat
               lightweight welded chain, machine screws and nuts that  for each safety on the boiler allowing a few seconds
               fit through the chain and two pulleys per valve that will  between lifts to let things stabilize before doing the
               carry the chain. Figure out where you’re going to put it  next one. What should happen is you’ll hear the steam
               before you go to the store then add twenty feet per boiler  belch out of the valve and then stop—pop and stop. In
               to have enough chain to do the job. You may also need  the very unlikely situation (which normally occurs only
               some clamps to attach to building steel, screw eyes for  when you haven’t tested the valves regularly) that you
               wood structures, or lead anchors and eye bolts to attach  hear steam weeping through the valve after a lift test
               to a concrete ceiling to suspend the pulleys. Connect one  you should operate it again as soon as possible to blow
               end of the chain to the eye that’s at the end of the safety  whatever got under the seat out.
               valve lifting lever (that’s what the eye is there for) and     Pop testing of a safety valve is normally done as
               run the chain through the pulleys so it drops to a reason-  part of the semi-annual inspections on high-pressure
               able height above the operating floor near a walkway.  boilers and during annual inspection of another boiler
               Finally, to prevent the chain running out on you, you  in low pressure plants. That operation is described in the
               need something at the other end to offset the weight  section on annual inspection.
               of the chain between the two pulleys. I always suggest     What about safety testing on hot water boilers?
               making a combination operating handle and weight that  Well, you can test the safety valves on HTHW boilers
               looks like the one in Figure 2-5. Yes, it looks sort of like  using the same rules as steam boilers. Always make it
               a stop sign and that’s intentional. It should have a red  a point to ensure everyone is clear of the vents on the
               background with white border and lettering to add to  boiler room roof before testing because the discharge
               that effect. That’s because you don’t want some visitor  will include water as well as steam. If problems occur
               to come wandering by and wondering what happens  when testing (like hot water splashing all over) the valve
               if he pulls it. Making it about 2½ inches wide makes it  discharge piping is not arranged properly.
               relatively comfortable in the hand. It you make it from     Regular  hydronic  and  hot  water  heating  boiler
               at least 10 gauge steel with the edges ground smooth is  safety relief valves shouldn’t be tested by lifting them.
               should be very comfortable to operate the lifting lever  Normally the system pressures are nowhere near 75% of
               with it. Finally, mount it so it’s above the top of the head  the valve setting and that’s one reason why. When asked
               of the tallest Operator in the plant and low enough for  what to do about them I only recommend that they be
               the shortest one to reach it. You can make a wire hook  removed from the boiler during each annual or biannual
               from an old coat hanger wrapped to a pipe off to the  inspection and examined by looking at the inlet and
               side of the walkway to store it to keep it from knocking  outlet. If you see scale buildup on either side replace
               heads or catching on something you’re carrying down  the valve. Hot water boilers are typically equipped
               that aisle.                                          with PTV valves (pressure and temperature relief) The
                    Oh! I didn’t say how to do a lift test? Well all you  temperature relief is accomplished by a small diameter
               do is check the pressure, the boiler load, and make sure  cylinder that hangs out of the bottom of the valve and
               you’re grabbing the handle that’s attached to the safety  contains a fluid or wax that expands with temperature
                                                                    and will force the valve open at the set temperature. Un-
                                                                    like steam safety valves they do not have to be installed
                                                                    vertically and must be installed so that cylinder is in the
                                                                    heated water.
                                                                        A hot water boiler explosion occurred several
                                                                    years ago at a school in Oklahoma with several children
                                                                    and some teachers injured. It was because a contractor
                                                                    didn’t understand the application of a PTV valve and
                                                                    changed its mounting. Another hot water heating boiler
                                                                    generated steam in a school in Baltimore in 1999 so the
                                                                    water was pushed back through the cold water line by
                                                                    the expanding steam to flash out a toilet as a little girl
                                                                    flushed it with disastrous consequences for her. Those
                                                                    valves have to installed according to the manufacturer’s
                            Figure 2-5. Safety lift grip            instructions and inspected regularly.