Page 90 - Boiler_Operators_Handbook,_Second_Edition
P. 90

Boiler Plant Operations                                                                              75


                    Frequently the reason for a boiler shutdown can be  time spent in doing that will determine the extent of
               determined, and corrected, quickly so it can be returned  damage by thermal overstress.
               to service. Many times it’s resolved quickly and the boil-     Rather than heating all the water in the boiler you
               er is returned to service even before anyone else notices  can bring warm or hot water in to help accelerate the
               you have a problem. When that can’t happen, then it’s  warm-up. That’s especially true when the boiler is the
               time for an emergency boiler start-up.               only one you’re firing. Temporarily shutting off the
                    Any emergency that results in the shutdown of a  makeup water and operating the boiler blowoff valves
               boiler should be responded to with an instant evaluation  to drop level so the heated water from the boiler feed
               of the condition of that boiler. If you’re confident that it  tank or deaerator displaces much of the cold water
               cannot be returned to operation or are not sure why it  in the boiler will both add to the heating of the boiler
               went down the first step would be to start another boil-  and provide some movement of water to help transfer
               er, if you have one, so it’s warming up. Starting the other  that heat to the thick parts of the boiler metal. Once
               boiler takes time from finding the problem with the unit  you’ve about drained a boiler feed tank you can restore
               in operation but it also allows for a more gradual warm-  the makeup. Let a deaerator sit until you’re producing
               up of that boiler in the event the one that was running  steam then bring the makeup on real slowly.
               can’t be restarted.                                      In an emergency you want to push the envelope as
                    Of course, if you know it went down because of a  much as possible without damaging the boiler. Your di-
               short power interruption, or other cause you know will  saster plan should have been developed after some test-
               not prevent a restart, there’s no reason to start that other  ing that determines what firing rate provides the fastest
               unit. If there’s water and steam pouring out of the boiler  warm-up of the boiler within the limits recommended
               that shut down or large gaping holes in what used to be  by the boiler manufacturer so you can immediately set
               square casing you know there’s no hope for the boiler  that firing rate to get the fastest possible warm-up.
               that went down and all you can do is secure it.          If your normal procedure for warm-up includes
                    I define an emergency boiler start-up as one that  shutting the burner down, don’t do it. I’ve never been a
               requires operation of a boiler from a dead cold condition  proponent of that activity other than for refractory dry
               in as little time as possible. There are things you can do to  out. If you think about it, the operation of the burner
               limit the damage to the boiler in that process and actually  followed by a purge produces dramatic swings in the
               accelerate the start-up time. Which ones are available to  metal’s  exposure  to  temperatures  on  the  fire  sides.  I
               you will determine what you do. You can use these sug-  think you will do less damage to the boiler by firing con-
               gestions as guidelines to prepare your own disaster plan  tinuously, although at low fire, than cycling the burner
               that describes an emergency boiler start-up.         on and off. In multiple burner boilers, where you’re only
                    Frequently heating boilers are allowed to sit idle  operating one or a portion of the burners during warm-
               with their steam valves open. This frequently gives the  up, operation should consist of firing another burner
               operator an impression that the boiler is ready to go  before shutting one down as explained in the first dis-
               because there’s pressure on it. Nothing could be further  cussion on start-up.
               from the truth and I discourage that practice because it     Then, of course, there’s the matter of how serious
               injects a considerable temperature swing in the shell of  the need for steam is. Loss of steam for blanketing chem-
               the boiler right at the water line. Steam at the surface  ical reactions may be more critical than damage to the
               is at saturation and hot, the original boiler water and  boiler. In a hospital during a disaster where every oper-
               condensate below the surface can be much cooler. Even  ating room is handling emergency surgery maintaining
               systems that drain the condensate from the bottom of  steam for sterilization is a must. In such situations your
               the boiler do not correct for the fact that the majority of  disaster plan can call for ignoring the manufacturer’s
               the water in the boiler is relatively cold.          recommendations so you bring a boiler up to operation
                    Power boilers will always be considerably colder  as fast as possible.
               than normal steam condition. The principle concern in     At some point you’ve established how much time
               an emergency start of a boiler is the development of  it will take to recover and documented it in your disaster
               stresses in the boiler metal associated with rapid heat-  planning. That information should be supplied to the
               ing of the boiler. Whether it’s a low pressure firetube or  facility served by the boiler plant so they’re aware of it
               a large watertube doesn’t matter much, both have thick  when preparing their disaster plans. Some facilities may
               steel parts in contact with the boiler water that have  reply with the question “is that the absolutely quickest
               to be heated to normal saturation temperature and the  you can do it?” In most cases you can answer “No, but