70                                                                                Boiler Operator’s Handbook


               heater) and the inlet to the stack.                  at a later date will prove the boiler wasn’t abused while
                    Sometime in the future you should be applauded  waiting for a load.
               for taking readings of shell or casing temperature. The     Acceptance tests vary. ASME PTC-4.1 the “Steam
               best way to do this today is with an infrared camera that  Generating Units” power test code provides three
               is calibrated to accurately indicate temperatures. There  means of testing a boiler for acceptance. However, a test
               are contractors that provide an infrared survey service  in conformance with that test code is an expensive prop-
               that could be used. There are less expensive methods  osition requiring continuous documented operation of
               including use of an infrared thermometer or as simple as  the boiler for a period of 8 to 12 hours. It’s justified for a
               holding a thermometer against the casing or shell with a  boiler designed to generate more than 60,000 pounds of
               piece of insulation. That last method has to be described  steam per hour but not for a small 50-horsepower boiler
               along with the recorded data because the insulation  that only generates 1,700 pounds per hour. There are
               does restrict heat flow and produces a higher tempera-  other simpler and acceptable means for testing boilers;
               ture than actual so the same method must be used for  the important element is having established one accept-
               comparison at a later date. I have detected consider-  able to owner and manufacturer before the boiler is pur-
               able differences in the temperatures of casing surfaces  chased. In the unlikely event the boiler fails to perform
               on water tube package boilers and recommend taking  the manufacturer is then committed to make it right.
               several measurements of those surfaces. I also insist that     For small boilers, I always recommend testing for
               new water tube boilers be fitted with insulated drum  one hour at each load point and, with that exception,
               head covers and their surface temperatures should be  testing using the “heat loss method” of PTC-4.1. That
               recorded as well. If your boiler (new or not) isn’t fitted  way you have a formal acceptance test but not the ex-
               with insulated drum covers measurements of the drum  pense of long runs. It shouldn’t require any overtime
               head surfaces should suggest an early modification to  because you should allow it to settle for half an hour
               your new boiler to include them.                     before each test to establish test conditions, and you can
                    Photographs of the flame in the furnace for each  do six a day. On a boiler with two fuels that would mean
               fuel as well as each load can be used for comparison in  no less than four days just running acceptance tests. I al-
               the future. I carry a piece of blued glass to reduce the  ways wonder what some engineers were thinking when
               light intensity when photographing a fuel oil or coal  they said the start-up should take a couple of days, it
               fire because my camera is typically blurred when photo-  takes more time to check operation and tune the boiler
               graphing flames of those fuels.                      than it does to test it.
                    If the boiler is fitted with automatic controls your     A final acceptance test when a boiler is field erected
               recorded data should include each controller’s set point  is very important. A contractor can build a boiler wrong
               (whether manually set, fixed, or remote), process vari-  and many have. What about the boiler that is factory
               able value and/or percent, and the controller’s output  tested? I would still run an acceptance test of the final
               signal, normally in percent.                         installation. The cost of a boiler is a small fraction of the
                                                                    cost of fuel it will burn in its lifetime; on average—ten
               Acceptance Testing                                   times the price of the boiler each year. A small differ-
                    The final step in start-up of a new boiler should  ence in performance can represent a considerable sum. I
               be the performance of an acceptance test. Data should  actually estimate the cost of a 1% difference in efficiency
               be collected and recorded at the firing rate where ef-  for a particular installation and use that value, with the
               ficiency is guaranteed by the manufacturer and, if it is a  vendor’s knowledge, in evaluating boiler offerings.
               modulating boiler, at no less than three other firing rates     Other start-up activities that may be associated
               (maximum, 75%, 50%, and 25% being common). All data  with a new plant are covered in the following descrip-
               collected should be carefully recorded and stored in a  tions.
               binder for future reference. If it is a new plant the per-
               formance of all equipment should be documented at the
               various firing rates. Occasionally a plant is started when  DEAD PLANT START-UP
               there is no place to use the steam and no way to perform
               the test until other installations are in place. The install-     All personnel working on the site within the boiler
               ing contractor then requests a delay in testing until a  plant and equipment rooms should be notified of the
               load is available. When that occurs collect data at firing  plant startup so they are not surprised and more impor-
               rates which can be handled. Nearly identical readings  tantly not injured as, the system comes up to tempera-