Page 144 - Boiler plant and distribution system optimization manual
P. 144

Over 100 Ways to Improve Efficiency                                                              129



                Advantages/disadvantages                            and smoking and soot formation prevented, the
                     It may be expensive to install a completely    linkage  should  be  precise  with  no  play.  Some-
                new  control  system  just  to  have  cross  limiting.   times pins are lost and threaded bolts are substi-
                However,  if  this  condition  is  not  corrected,  the   tuted instead and over time, these sharp threads
                price in unburned combustibles and higher stack     cause elongated holes and a tremendous amount
                temperatures will surely be taking an undesirable   of play. Also, non-precision parts are used to sub-
                share of your fuel budget.                          stitute for lost or damaged parts. Control linkag-
                                                                    es also bind, warp, shear pins and otherwise lose
                                                                    their precision over the years and the only solu-
                8.   IMPROVE CONTROL SYSTEM ACCURACY                tion is to restore it to a precision system.
                     WITH STRONG PRECISION PARTS
                                                                    Advantages/Disadvantages
                Cost                                                     You may have a burner and control system
                     Low                                            that can’t be adjusted to maintain low excess air
                                                                    levels and high efficiency. If so, some custom re-
                Potential Savings                                   building may be necessary. It’s a cheap enough
                     Moderate (2% to 12%)                           solution but you may have to be innovative and
                                                                    use aircraft grade precision parts as shown in Fig-
                Description                                         ure 10.27.
                     If your control system is flimsy and does not
                have  strongly  built  precision  parts,  the  chances
                are that you can’t get a good tuneup or repeatabil-  9.   STACK DAMPERS
                ity. If control system linkage has any play at all,
                precise excess-air levels cannot be maintained.     Cost
                For example, only 1/100 of an inch play in control       Low
                system linkage can cause the need for a 5% excess
                air buffer zone.                                    Potential Savings
                     If low excess air levels are to be maintained       Moderate (5% to 20%)
































                                                            Figure 10.27
   139   140   141   142   143   144   145   146   147   148   149