164            SECTION 2                                        STRENGTHENING AND REPAIR WORK



         Table 4.5  Selection of HS-20 and alternate HL-93 tandem truck moments and forces for smaller increments in span.
                  Max. Truck Moments                          Max. Truck Shear/Reactions
         Span                            †
                  Author’s Formula*   Tandem    Governing Truck  Author's
         Length   HS-20            Two 25 Kip axles Moments   Formula**   Tandem Two 25   Governing Truck
         (Feet)   (Kip-Ft)         (Kip-Ft)     (Kip-Ft)      HS-20 (Kips)  Kip Axles (Kips)  Shear (Kips)
         20       28’distance between  200 moments  200       38.4        45              45
                  outer axles> 20’
                  formula N/A
         22        133.85          225           225          41.45       45.45           45.45   Tandem governs
         24        168.38          250           250          44          45.83           45.83
         26        203.12          275           275          46.15       46.15           46.15
              Small spans
         28        238.05          300           300      Tandem governs  48  46.43       48
         30        273.12          325           325          49.6        46.67           49.6
         32        308.31          350           350          51          46.88           51
         34        343.59          375           375          52.24       47.06           52.24
         36        378.95          400           400          53.33       47.22           53.33
         38        414.38          425           425          54.32       47.37           54.32
         40        449.87          450           450          55.2        47.5            55.2    HS-20 governs
         42        485.40          475           485.4        56          47.62           56
         45        538.78          512.5         538.78       57.07       47.78           57.07
         50        627.91          575           627.91       58.56       48              58.56
         55   Medium spans  717.20  637.5        717.20   HS-20 governs  59.78  48.18     59.78
         60        806.61          700           806.61       60.8        48.33           60.8
         65        896.11          762.5         896.11       61.66       48.46           61.66
         70        985.68          825           985.68       62.4        48.57           62.4
         75       1075.31          887.5        1075.31       63.04       48.67           63.04
         * M max 3 18 (L 6 1.55)(L 6 14)/Lkip-ft
         ** V max 3 24(3L 6 28)/L kips



                              Advantages of rolled sections are thicker webs, and stocky, compact sections. Ready
                            availability due to mass production is the reason for their widespread use for smaller spans.
                            Due to thicker webs, the use of transverse web stiffeners is avoided. Weathering steel helps
                            in maintenance costs through minimal painting.
                              The disadvantages are using a uniform fl ange thickness along the span which is uneco-
                            nomical since bending moment is maximum at midspan but reduces along the length.
                        2. Rolled sections with cover plates.
                              With single or two layers of plates, the application of rolled sections can be extended to
                            spans of about 80 feet. It has been a practice in the past to weld cover plates in regions of
                            peak positive and negative bending moments. This resulted in economical design compared
                            to using rolled sections only. However, tension welds at midspan and at supports are sub-
                            jected to fatigue and need to be checked. Inspection of welds using NDT techniques and
                            maintenance of fatigue prone details for older bridges are expensive. Current practice is to
                            avoid this approach in favor of fabricated girders.