15.12   CHAPTER FIFTEEN
           3.04  DRAINAGE COURSE INSTALLATION (FILTER FABRIC/CORE)

           A.    Vertical Surfaces or Planters - MD-2000, MD-6000, MD-6200, MD-8000, or MD-9000
                  1.  Completed Walls - Position the panel with the flat side against the wall and filter fabric toward the
                     soil/drainage side.  A washer headed concrete nail may be used to attach the panel against the
                     concrete  wall.  Alternate methods of the attachments  use concrete nails  driven through wood
                     strips placed over the Miradrain or Mirastick construction adhesive.  Most methods used to secure
                     protection board are acceptable.

                  2.  Over Miradri Waterproofing Membrane - Place the  Miradrain over the waterproofing membrane.
                     Use two sided Mirabond  tape or  Mirastick construction adhesive to secure the  Miradrain to the
                     waterproofing membrane.  Most methods used to secure protection board are acceptable.
                  3.  Against Shoring Systems or Vertical Soil Excavations - Position the panel with the fabric facing the
                     shoring  or  soil.  Nails  of  sufficient length should  be used to pin the  panel  directly  against  the
                     shoring or soil.  The fabric should lay flat against the shoring or soil to minimize voids.  The flat
                    side of the Miradrain may then receive the waterproofing material.  Concrete or shotcrete may be
                     placed directly against the waterproofing or back side of the Miradrain if waterproofing is not used.

                  4.  Buttress Drainage and Landslide Repair - Miradrain should be rolled out fabric side down onto the
                    properly  prepared subgrade.  A "chimney" drain type drain pattern should be formed.

                    Spacing  between Miradrain  chimney  drains will be dictated by the  engineer.  Chimney  drains
                    should be connected to the continuous horizontal collector panel  by overlapping a minimum of
                     12 inches into the collector panel.
                    Miradrain  panels  may be secured to the subgrade by ballasting  with soil or nailing through the
                    Miradrain panel  into the underlying  hillside.  Fabric flaps must be folded over onto the core and
                    secured with duct tape or soil ballast.

                 5.  Edge Drain or Trench Drain -
                    Miradrain  5000  should  be  laid  out  in 50 foot lengths  adjacent  to the  previously cut/excavated
                    trench.

                    Panel  end  laps  may be  connected  by overlapping  the  panels  and  applying  locking  clips  or
                    buttoning of the dimples.  Flexible corrugated polyethylene or  rigid  PVC pipe, which has been
                    wrapped with Mirafi filter fabric should be placed in the bottom of the trench.  The Miradrain  panel
                    should be lowered into the trench beside the pipe and temporarily secured to the trench wall by
                    nailing or propping.  The Fabric side of the panel must face the direction from which the water is
                    flowing.  Fabric overlaps on the top of the Miradrain  panels should be draped over the back of the
                    core.  Backfilling should be completed  immediately.

                 6.  Connecting Adjacent Panels - Connect adjacent panels at the longitudinal  edge by pulling the filter
                    fabric back to expose the flange.  The flangeless panel edge should be placed on top of the flange
                    of  the  adjacent  panel  and butted  dimple  to dimple.  All  connections  should  be completed  in
                    shingle fashion so that moisture will flow with the overlap and not against it.  Overlap fabric in the
                    direction of water flow.  Cover all terminal edges with the filter fabric flap by tucking in behind the
                    core.

          B.     Horizontal Surfaces - MD-9000 or MD-8000 (hydrocarbon-resistive applications)
                 1.  Plaza Decks, Parking Decks, and other Split Slab Construction - MD-9000
          FIGURE 15.1 (Continued)  Guide specification for section 2715, prefabricated drainage system. (Courtesy TC MiraDRI)