15.14   CHAPTER FIFTEEN
           B.     Terminal  Connections  and  Protrusions - Cover  all  terminal  edges with the  integral  fabric flap by
                  tucking  it  around  the  edge  of  the  core  and  securing  it.  At  protrusions,  cut the core  around  the
                  protrusion, cut an "X" in the fabric, and tape the fabric  around the protrusion.  Dirt and concrete must
                  not infiltrate the core.


          3.06    RELATED PRODUCTS INSTALLATION REQUIREMENTS
                 A.  Earthwork Backfilling:  Refer to Division 2 Earthwork Section for installation  requirements.

                  B.  Waterproofing:  Refer to Division  7 Waterproofing Section for installation  requirements.
          3.07    FIELD QUALITY CONTROL

                 A.  Manufacturer's  Field  Services:  Upon  Owner's  request,  provide  manufacturer's  field  service
                    consisting  of  product  use  recommendations  and  periodic  site  visits  for  inspection  of  product
                    installation  in accordance with manufacturer's  instructions  and warranty  requirements.

          3.08   CLEANING AND PROTECTION

                 A.  Cleaning:  Remove temporary coverings and protection of adjacent work areas.  Repair or  replace
                    damaged  installed  products.  Clean  installed  products  in  accordance  with  manufacturer's
                    instructions prior to owner's acceptance.  Remove construction debris from project site and legally
                    dispose of  debris.

                 B.  Protection:  Protection installed  products finished surfaces from damage during  construction.
          END OF SECTION  02715
          FIGURE 15.1 (Continued)  Guide specification for section 2715, prefabricated drainage system. (Courtesy TC MiraDRI)