15.14 CHAPTER FIFTEEN
B. Terminal Connections and Protrusions - Cover all terminal edges with the integral fabric flap by
tucking it around the edge of the core and securing it. At protrusions, cut the core around the
protrusion, cut an "X" in the fabric, and tape the fabric around the protrusion. Dirt and concrete must
not infiltrate the core.
3.06 RELATED PRODUCTS INSTALLATION REQUIREMENTS
A. Earthwork Backfilling: Refer to Division 2 Earthwork Section for installation requirements.
B. Waterproofing: Refer to Division 7 Waterproofing Section for installation requirements.
3.07 FIELD QUALITY CONTROL
A. Manufacturer's Field Services: Upon Owner's request, provide manufacturer's field service
consisting of product use recommendations and periodic site visits for inspection of product
installation in accordance with manufacturer's instructions and warranty requirements.
3.08 CLEANING AND PROTECTION
A. Cleaning: Remove temporary coverings and protection of adjacent work areas. Repair or replace
damaged installed products. Clean installed products in accordance with manufacturer's
instructions prior to owner's acceptance. Remove construction debris from project site and legally
dispose of debris.
B. Protection: Protection installed products finished surfaces from damage during construction.
END OF SECTION 02715
FIGURE 15.1 (Continued) Guide specification for section 2715, prefabricated drainage system. (Courtesy TC MiraDRI)