P. 88
scenario 7. number value Monetary Profit ($) revenue Total ($) cost import Energy ($) cost mission 57.8 930 246 126.8 1005 252 126.8 1005 252 17 942 298.8 452 1320 241.8 1038 465 98.8 1082 357 171.7 1359.5 540 167 1340 415.8 387.8 1379 234 802.8 1560 0 546.95 1304.15 0 918.6
for E 79.2 79.2 79.2 79.2 79.2 79.2 79.2 100.8 115.2 115.2 115.2 115.2 194.4 219.6 219.6 190.8
value ($)
monetary cost Gen 547 547 547 547 547 547 547 547 642 642 642 642 857 1049.5 1049.5 783.25
and G3 250 250 250 250 250 250 250 250 300 300 300 300 300 300 300 300
schedule (kW) dispatch
Dispatch Power G2 0 0 0 0 0 0 0 0 0 0 0 0 100 150 150 75
2.8 G1 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300
TABLE Hour 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16