Page 408 - Design for Six Sigma a Roadmap for Product Development
P. 408

Labor rate,  30     $/h, L  Service task  performed  Remove plastic cover  Fasten setscrew

                                             Add PCB  Fasten screw  Plug in sensor  Reorient  Remove knob  Reorient  Screw on cover





                                             10.42  25.33  7.167  3.75  5.25  5.25  6.667  7.25
                      10                  Operation cost, cents    38
                                          [(9) 
 L]/36



                      9                     (2) 
 [(6)   (8)]  Operation time, s   (4)  12.50  30.40  8.60  4.50  6.30  6.30  8.00  8.70  45.60


                                             4.90  4.40  4.50  4.90  4.90  8.00  4.50
                      8                   Item insertion or  13.80  13.80
                                          operation time, s
                 Assembly: pressure recorder  7  6  or operation code  Four-digit item insertion  Item acquisition time, s   0001  3.4  0401  1.4  3000  5800  0001  1.4  0001  1.4  2700  5800  0401  1.4













                      5                   acquisition code  Four-digit item  5601  5600  5600  5600  5600


             The Reassembly Worksheet  4  3  Tool acquisition time, s  acquisition code  Four-digit tool  4.2  5700  4.2  5700  4.2  5700












             10.6     2                   operation is repeated  Number of times  1  2  1  1  1  1  1  1  3  109.1  C r
             TABLE    1                   ID number  1  2  3  4  5  6  7  8  9  130.9  T r




                                                                       375
   403   404   405   406   407   408   409   410   411   412   413