Page 406 - Design for Six Sigma a Roadmap for Product Development
P. 406
Labor rate, 30 $/h, L Service task performed Remove screws Reorientation Loosen setscrew Remove knob Remove cover Reorient Unplug screw Remove screws Remove PCB
11 functional connections items, cover parts of Number of service 0 0 0 0 0 0 0 0 1
35.25 10.17 19.17
10 [(9)
L]/36 3.75 3.167 3.167 3.75 5.333 3.167
Operation cost, cents
9 (4) (2)
[(6) (8)] Operation time, s 42.3 4.5 12.2 3.8 3.8 4.5 6.4 23 3.8
Assembly: pressure recorder 8 7 Item set-aside time, s set-aside code Four-digit item 1.4 5500 1.4 5500 1.4 5500 1.4 5500 1.4 5500 total number of service items.
4.5
2.4
2.4
11.3
6.4
4.5
2.4
6
8
8
operation time, s
N m
Item removal or
total operation cost;
5 of operation code 1710 5800 4100 1500 1500 5800 4401 1700 1500
Four-digit item removal
4 Tool acquisition time, s 4.2 4.2 4.2 C d
Disassembly Worksheet 3 acquisition code Four-digit tool 5700 5700 5700 1 N m total operation time;
10.5 2 operation is repeated Number of times 3 1 1 1 1 1 1 2 1 86.92 C d T d
TABLE 1 ID number 1 2 3 4 5 6 7 8 9 104.3 T d Note: