Page 405 - Design for Six Sigma a Roadmap for Product Development
P. 405
Loosen setscrew
Remove screws
Remove screws
Service task
Unplug screw
Reorientation
Remove cover
30
Labor rate,
performed
Remove knob
Remove PCB
Reorient
$/h, L
functional connections
11
0
0
1
0
0
0
0
0
0
items, cover parts of
Number of service
5.333
3.167
3.167
3.167
3.75
3.75
35.25
19.17
10.17
[(9)
L]/36
10
Operation cost, cents
12.2
42.3
6.4
3.8
3.8
3.8
4.5
4.5
(4) (2)
[(6) (8)]
9
23
Operation time, s
Assembly: pressure recorder
1.4
1.4
1.4
1.4
1.4
8
Item set-aside time, s
5500
5500
5500
5500
5500
7
set-aside code
Four-digit item
11.3
6.4
2.4
4.5
2.4
2.4
4.5
6
operation time, s
8
8
N m total number of service items.
Item removal or
total operation cost;
5 of operation code 1710 5800 4100 1500 1500 5800 4401 1700 1500
Four-digit item removal
4 Tool acquisition time, s 4.2 4.2 4.2 C d
Disassembly Worksheet 3 acquisition code Four-digit tool 5700 5700 5700 1 N m total operation time;
10.5 2 operation is repeated Number of times 3 1 1 1 1 1 1 2 1 86.92 C d T d
TABLE 1 ID number 1 2 3 4 5 6 7 8 9 104.3 T d Note:
374