Page 407 - Design for Six Sigma a Roadmap for Product Development
P. 407

Assembly: pressure recorder  Labor rate,  30     $/h, L  10  9  8  7  6  Service task  performed  [(9) 
 L]/36  Operation cost, cents      (2) 
 [(6)   (8)]  Operation time, s   (4)  operation time, s  Item insertion or  or operation code  Four-digit item insertion  Item acquisition time, s   Add P





                                             5601  5600  5600  5600  5600
                      5                   acquisition code
                                          Four-digit item

             The Reassembly Worksheet  4  3  Tool acquisition time, s  acquisition code  Four-digit tool  4.2  5700  4.2  5700  4.2  5700













             10.6     2                   operation is repeated  Number of times  1  2  1  1  1  1  1  1  3  109.1  C r
             TABLE    1                   ID number  1  2  3  4  5  6  7  8  9  130.9  T r



                                                                       375
   402   403   404   405   406   407   408   409   410   411   412