Page 204 - Design for Six Sigma for Service (Six SIGMA Operational Methods)
P. 204

Value Engineering  175

        Table 7.21 Action Plan for Selling Value Engineering (VE) Ideas

                                                         How to Solve
          Department  Supervisors  Action Required  Problem  Problems
          1.

          2.
          3.

          4.
          5.
          6.

          7.



        defined. Sketches should show the basic changes in whatever detail is
        necessary to prove results. It may be necessary to provide simple models in
        some cases. You should list all advantages and disadvantages and show how
        the disadvantages were considered in your decision. If the procedure has been
        followed, all necessary data should be available in your notes and records.

        It is important to realize that it is necessary to present the recommendation
        in a manner that will clearly demonstrate the advantages of its acceptance
        from the standpoint of the organization required to implement it. The
        importance of the reporting phase should not be overlooked. If the recom-
        mendations are not presented properly and effectively, the result may be the
        loss of a good idea or an excellent recommendation.


        The work sheets provided in this chapter have been developed to provide
        all the information necessary to prepare an effective recommendation.
        They are complete and concise. The next step is to arrange the material
        so that it will sell your idea. One of the most important considerations
        here is to provide complete information. Failure to provide complete
        information has been proven to be a major cause for rejection of a
        proposal. Persons who are required to review or approve proposals of one
        type or another will verify that it is rare when complete information is
        provided. In fact, the government made an analysis of 90 rejected contractor
        proposals submitted to them for approval and found that 40 percent of the
        rejections were the result of incomplete or inaccurate technical or cost
        information.
   199   200   201   202   203   204   205   206   207   208   209