State street  assembly  1x  daily







         90/60/30 day  forecasts      Shipping  Staging    = 4.5 days  = 166 sec.




                          20   20                         Production  lead time  Value-  added  time
                                      L    R
                        20
                                                   Elim. waste
             Daily  order  20     20                        2 days


                 Daily order          Weld + assy.  Takt = 58.6 sec.  Uptime = 100%  Time = 165 sec.  165 sec.

         Production  control                     C/O = φ  2 shifts  Total work


                                  Tote                   uptime

        6-week  forecast  Coil                  Weld  changeover  Welder  1 day  The Future State Value Stream Map

                               Batch


            Daily  order   Coil       Stamping  Changeover  EPE = 1 shift  C/O < 10 min.  1 sec.


           Michigan  Steel Co.  Daily  (milk run)  Coils  (at the press)  1.5 days  Figure 10.25












        376