192    Section  Five—UNDERGROUND PIPING

                            HAND     EXCAVATION


                        NET  LABORER  MAN HOURS PER  CUBIC  YARD


                                          First          Second           Third
          Soil           Excavation        Lift           Lift            Lift

                        General  Dry      1.07            1.42            1.89
      Light             General Wet       1.60            2.13            2.83
                        Special Dry       1.34            1.78            2.37


                        General  Dry      1.60            2.13            2.83
      Medium            General  Wet      2.14            2.85            3.79
                        Special Dry       1.07            2.49            3.31

                        General  Dry      2.67            3.55            4.72
      Hard or  Heavy    General Wet       3.21            4.27            5.68

                        Special Dry       2.94            3.91            5.20

                        General Dry       3.74            4.97            6.61
      Hard  Pan         General Wet       4.28            5.69            7.57
                        Special  Dry      4.01            5.33            7.09


      Man hours include picking  and loosening where necessary and placing on bank out  of way of  ex-
      cavation  or  loading  into trucks  or  wagons  for  hauling away.  Man hours  do not include hauling
      or  unloading.