Page 217 - Estimators Piping Man Hour Manual
P. 217

Section           Seven



                           PAINTINO





                           This  section  deals  solely with the  sandblasting
                           and  painting  of a  piping  system  and  is  so  ar-
                           ranged  as  to  include  the  direct  man  hours  by
                           pipe  size  for  six  (6) different  types  or  speci-
                           fications.
                           We  have  not  covered  color  coding  under  this
                           section  due to the fact  that the  scope  of the  work
                           involved  in  this  operation  can vary  so greatly.
                           As an example,you  maybe able  to set-up in one
                           location  and band as  many  as  a  dozen  lines, on
                           the other  hand  the same  set-up  maybe  required
                           to  band  one  line.  Therefore,  we  feel  that  this
                           operation  must be looked at  individually  accord-
                           ing to piping specifications  and locations.



























                                      200
   212   213   214   215   216   217   218   219   220   221   222