Page 304 - Fair, Geyer, and Okun's Water and wastewater engineering : water supply and wastewater removal
P. 304

JWCL344_ch07_230-264.qxd  8/2/10  8:44 PM  Page 264







                    264  Chapter 7  Water Distribution Systems: Modeling and Computer Applications
                    7.9  A planning commission has indicated a new industry  minimum pressure of 260 kPa will be added to the
                    may be connected to the water system described in Problem 7.8.  system. It could be tapped into the network at either
                    You are to determine the pipe diameters in the network to  junction 6, 7, or 8. Size the pipes for the conditions
                    minimize the installation cost assuming all the pipes are duc-  in part I along with the industry added to all pro-
                    tile iron. Use the Darwin Designer module to determine the  posed junctions. You will need to analyze the net-
                    total cost and size each pipe for each of the following condi-  work three times, once for the industry at J-6, again
                    tions. Use the pipe cost information from Problem 7.4 for the  with the industry at J-7, then finally with the industry
                    ductile-iron pipe.                                     at J-8.
                        I. Size the pipes using a demand multiplier (peaking fac-  1. Indicate which option(s) would work best.
                          tor) of 3.2. The pressure must remain between 170 and  2. Which junction should the industry be tapped into
                          550 kPa during peak demand. Exclude pipes P-7 and  to be the least costly and what is the expected cost?
                          P-8 in your analysis when determining the pipe sizes.
                          [Hint: You will need to specify an additional demand  3. What is the size of each pipe for the best solution at
                          of zero (0 L/min) with the default pressure constraints  the least costly option with the industry added?
                          at the junctions or a fatal error will occur.]   4. What is the calculated minimum pressure at the in-
                                                                             dustry for the best solution?
                        II. It is expected that a new industry with an expected
                           additional demand of 2,000 L/min with a required



                    BIBLIOGRAPHY
                    American Water Works Association, Computer Modeling of  Haestad Methods, WaterGEMS: Geospatial Water Distribution
                       Water Distribution Systems, Manual of Water Supply  Software, Haestad Press, Waterbury, CT, 2002.
                       Practices M32, 2nd ed., Denver, CO, 2005.    Males, R. M., Grayman, W. M., and Lark, R. M., Modeling
                    Cesario, A. L.,  Modeling Analysis and Design of Water  Water Quality in Distribution Systems, J. Water Resources
                       Distribution Systems, American Water Works Association,  Planning and Management, 114, 197–209, 1988.
                       Denver, CO (1995).                           Rossman, L. A., and Boulos, P. F., Numerical Methods for
                    Haestad Methods, Advanced Water Distribution Modeling and  Modeling Water Quality in Distribution Systems: A
                       Management, Bentley Institute Press, Exton, PA, 2007.  Comparison,  J. Water Resources Planning and
                    Haestad Methods,  Computer Applications in Hydraulic  Management, 122, 2, 137, 1996.
                                                                                                                ®
                       Engineering, 7th ed., Bentley Institute Press, Exton, PA,  Walski, T. M., Water System Modeling Using CYBERNET ,
                       2007.                                           Haestad Press, Waterbury, CT, 1993.
   299   300   301   302   303   304   305   306   307   308   309