Page 21 - Subyek Teknik Mesin - Forsthoffers Best Practice Handbook for Rotating Machinery by William E Forsthoffer
P. 21

List of Best Practices
       B.P. 9.9: When to use a seal gas conditioning unit   B.P. 11.2: Maximizing pump unit bearing bracket oil change
       B.P. 9.10: Require a primary vent backpressure device  intervals
       B.P. 9.11: When to require a primary vent orifice bypass  B.P. 11.3: Optimize pump unit MTBFs by changing over
       device for tandem seal applications                  pumps every three to six months
       B.P. 9.12: When to use an ‘AND Trip’ to minimize primary  B.P. 11.4: PM oil system and dry gas seal system valves and
       vent trips                                           hardware at every turnaround
       B.P. 9.13: Route bearing vents independently         B.P. 11.5: Extending oil lubricated coupling PM maintenance
       B.P. 9.14: Differential pressure control for separation nitrogen  intervals
       supply                                               B.P. 11.6: Perform transient oil system tests immediately
       B.P. 9.15: Color code dry gas seal sub-systems       prior to turnaround shutdowns
                                                            B.P. 11.7: Trend all rotating equipment performance (head,
                                                            flow and efficiency)
       Chapter 10 The Post Shipment Phase:                  B.P. 11.8: Use PDM results to reduce PM tasks and expand
       Installation, Pre-Commissioning,                     PM intervals
                                                            B.P. 11.9: Integrate operations and process awareness into the
       Commissioning and Start-up Best                      reliability program
       Practices                                            B.P. 11.10: Conduct operator awareness training for all shifts
                                                            on a regular basis
       B.P. 10.1: Finalize all construction specifications during the  B.P. 11.11: Send reliability group members to yearly key
       engineering phase                                    machinery seminars
       B.P. 10.2: Preservation materials are available and the program  B.P. 11.12: Conduct yearly machinery vendor improvement
       is fully implemented                                 meetings on site
       B.P. 10.3: Ensuring vendor service representative effective site
       visits
       B.P. 10.4: Critical machinery foundation preparation best  Chapter 12 Implementation and
       practices                                            Communication Best Practices
       B.P. 10.5: Use epoxy grout for all machinery foundations
       B.P. 10.6: Proper process piping to machinery flange
                                                            B.P. 12.1: Obtain and maintain continued management
       alignment and foundation support                     support for machinery reliability issues
       B.P. 10.7: Best Practice oil flushing procedure
                                                            B.P. 12.2: Use site PDM results to continuously improve
       B.P. 10.8: Functional tests prior to start-up e proper  machinery best practices
       installation practices confirmation                   B.P. 12.3: How to ensure execution of the best practices in
       B.P. 10.9: Perform critical compressor air or nitrogen runs  this book
       during pre-commissioning                             B.P. 12.4: Establish a site specific machinery function
       B.P. 10.10: Perform driver solo runs to confirm proper  awareness training program
       operation of the control systems                     B.P. 12.5: Email effectiveness guidelines for optimum results
       B.P. 10.11: Obtain a CCM initial start-up baseline   B.P. 12.6: Guidelines for email recipients - who to send to,
       B.P. 10.12: Conduct mini-information sessions for operators  copy and blind copy
       B.P. 10.13: Implement the principle of CCM for all site
                                                            B.P. 12.7: Guidelines to producing effective meeting agendas
       machinery                                            B.P. 12.8: Guidelines to producing meeting minutes of
                                                            optimum effectiveness
                                                            B.P. 12.9: Guidelines to preparing effective reports
       Chapter 11 Preventive and Predictive
       Maintenance Best Practices

       B.P. 11.1: Minimize PMs and extend PM intervals by using
       condition monitoring (PDM) results



















           xx
   16   17   18   19   20   21   22   23   24   25   26