     Be st Practice 9 .11
       Be st Practice 9 .12          Dry Gas Seal Best Practices
         Best Practice 9.11
         Require a primary vent orifice bypass device, for tandem  present in the seal chamber and will exit the secondary (outside) seal
         seals, whenever the primary vent pressure, during a seal  during primary seal failure and/or upset conditions.
         failure can rise above the lowest value of N 2 supply
         pressure.                                          Lessons Learned
           If the seal reference pressure is below 400 kPa (60 psig)  Not having a primary seal vent orifice bypass device in high
         (Typical minimum plant N 2 header pressure), confirm that the  (greater than 400 kPa [60 psig]) seal reference gas appli-
         minimum available N 2 pressure at the intermediate seal labyrinth
                                                            cations has led to process gas releases in the plant during
         will always be greater than the maximum seal reference pressure
                                                            a primary seal failure.
         to ensure that N 2 gas will fill the seal chamber during a primary
         seal failure.
           If the seal reference pressure can be greater than the lowest value of  Benchmarks
         intermediate N 2 pressure, a weight loaded full stem disc valve set to  This best practice has been used during new projects since 2000 to
         open at a pressure 20 kPa (3 psi) below the lowest value of N 2 at the  result in optimum tandem dry gas seal system safety and reliability
         seal is recommended. This will ensure that N 2 gas will always be  (MTBFs greater than 48 months and counting!).
       B.P. 9.11. Supporting Material
                                                            vent pressure below the N 2 system pressure. A weight-loaded,
       If a complete primary seal failure can cause the pressure in the  stem-guided, full-flow disc valve is recommended. A rupture
       primary vent cavity to exceed the pressure that can be  disc can randomly fail and will require a unit shutdown for
       delivered by the N 2 system, the best practice is to relieve the  replacement.
         Best Practice 9.12
         Use an ‘AND trip’ (primary vent high pressure or flow along  excessive primary vent flow and detected secondary seal excessive
         with indication of secondary seal excessive leakage) to  leakage are present).
         prevent spurious trips while ensuring plant safety when-  A HAZOP review is required for implementation of this best
         ever plant daily revenue is greater than $1 MM/day.  practice.
           Historically, dry gas seal vendors have set primary vent trip levels at  Lessons Learned
         three times the normal primary seal flow.
           However, if the seal gas system is designed with the present (2010)  Large (mega) plants have learned that the previous phi-
         ‘best practice’ available features, increases in primary vent flow can be  losophy of primary vent only trips exposes the plant to
         safely accommodated.                               large revenue losses and the present dry gas seal system
           Best practice features which will ensure system safety during  best practices enable a safe (HAZOP accepted) alternate
         increased primary vent flow are:                    trip arrangement that will optimize plant revenue.
           The intermediate N 2 system that is automatically flow controlled.
           The use of a primary vent orifice bypass device (see B.P: 9.11).  Benchmarks
           If the exposure to daily revenue losses is large (greater than $ 1 MM/  The ‘AND trip’ approach has been recommended since 2008 and is
         day) and the above best practice features are used in the system, an  being used in many new large (over $1 MM/day) revenue plants to
         ‘AND trip’ philosophy is recommended (trip the unit only when  ensure plant safety and optimize plant revenue.
       B.P. 9.12. Supporting Material
                                                            of a high value product, where availability of the plant is critical,
       Monitoring and protection                            operations may choose to continue running for short periods
                                                            after the primary seal fails, while preparing for shutdown. In this
       The majority of current DGS installations trip on primary seal  case, the recommendation is to trip on indicated primary ‘AND’
       failure by measuring primary vent pressure or flow. In the case  secondary seal failure (atmospheric side for double seals). Trip