              The Post-Shipment Phase: Installation,
              Pre-Commissioning, Commissioning
              and Start-up Best Practices
              Introduction
              The safety and reliability of properly specified, sufficiently prepared in advance, which results in
              designed and tested critical machinery over the 30þ reducing the safety and reliability of the plant for its
              year plant life is directly related to the execution of entire life.
              the post-shipment phase activities. Unfortunately, it  This chapter therefore presents the post shipment
              is common practice that the required procedures, phase best practices that will optimize machinery
              materials and spare part storage facilities are not safety and reliability for each day of plant life.