Best Practice 1 0.3
                  The Post-Shipment Phase: Installation, Pre-Commissioning, Commissioning and Start-up Best Practices  Best Practice 1 0.4


               Best
               Best Practice 10.3Practice 10.3
               Ensure that site visits by vendor service representatives  Following all the guidelines noted above will optimize visit effec-
               are effective, by taking appropriate action at the time of the  tiveness and establish a good working relationship with the vendor
               vendor assistance request.                          representative.
                  Steps to ensure effective site visits are as follows:
                 Send detailed problem statements for each machinery item to be  Lessons Learned
                  covered                                          Vendor representative visits, particularly in remote areas,
                 Send detailed workscope for each machinery item to enable vendor  are not totally effective unless detailed site problem in-
                  representatives to be totally prepared           formation and requirements are sent well in advance.
                 Require vendors to submit two nominees (main and alternate) along  I have witnessed and been told of many ineffective vendor repre-
                  with contact reference phone numbers for last two field visits made  sentative visits, and I have discovered that none of the noted best
                  by the nominees                                  practices above had been followed.
                 State in vendor visit document that weekly visit reports are required
                  while on site and a final visit report is to be submitted prior to leaving  Benchmarks
                  site
                                                                   This best practice has been used since 1984 during a large petro-
                 Include any specific training requirements for the representative to
                                                                   chemical complex construction project and has since that time con-
                  present during the visit                         sistently produced effective vendor representative visits.








               Best
               Best Practice 10.4Practice 10.4
               Follow these critical machinery foundation preparation  vendor procedures will reduce the machinery train’s life
               best practices to ensure optimum machinery life cycle  cycle reliability.
               reliability:                                          I have been involved with project delays of over a month that have
                  Review the contractor’s machinery foundation procedure prior to  resulted from not having a foundation preparation procedure for critical
               the start of any equipment installation to confirm:  compressor trains. In this case, the subject compressor foundation
                 Proper foundation preparation procedures          bolt location was not coordinated with the location of the reinforcing
                 The contractor’s procedure, types of bolts and bolt arrangement,  bars, which required complete excavation of the foundation to achieve
                  meet or exceed the equipment vendor’s requirements and bolt  the proper location of the foundation bolts.
                  arrangements
                 The proper location of all foundation bolts to prevent baseplate bolt  Benchmarks
                  hole machining                                   This best practice has been used since the issue noted above was
                 Proper preparation of foundation bolts (stress relieving, etc.)  experienced (1988), and requires that a critical machinery foundation
                 Proper leveling of machinery                      procedure be prepared and reviewed by all project critical machinery
                                                                   vendors prior to the project construction phase. This best practice has
                  Having a critical machinery foundation preparation procedure that
                                                                   resulted in critical machinery foundations that have not required rework
               has been reviewed and accepted by the construction contractor prior
                                                                   and have produced critical machinery trains of the highest reliability
               to field construction will ensure a critical machinery foundation of the
                                                                   (99.7%þ).
               highest reliability, and optimize the overall machine train reliability.
               Lessons Learned
               Installing critical machinery without a foundation pro-
               cedure that is based on proven installation experience and





              B.P. 10.4. Supporting Material                       General considerations

                                                                   After the proper civil work is done, and the foundation is designed
              Foundations                                          in accordance with specifications, there are certain general con-
                                                                   siderations required. These are shown in Figure 10.4.1.
              The installation of properly designed and constructed founda-  Foundations must be rough enough to allow grout to adhere.
              tions plays an important part in the long term availability of  The elevation of the top surface should allow at least one inch of
              equipment. This section will cover the major aspects of sound  grout under the base plates or sole plates. When machinery is
              foundations.                                         mounted directly on the foundation, sole plates must be