Page 595 - Subyek Teknik Mesin - Forsthoffers Best Practice Handbook for Rotating Machinery by William E Forsthoffer
        P. 595
     Best Practice 1 1.2
                                                   Preventive and Predictive Maintenance Best Practices  Best Practice 1 1.3
              must be aware of the reliability program philosophy and must be  significantly increase the reliability of general purpose (spared)
              able to implement it. Having operators and machinists equipped  equipment through the implementation of an effective pre-
              and trained in the use of simple vibration instruments (vibration  dictive maintenance program.
              pens), oil condition monitors and laser temperature guns will
               Best
               Best Practice 11.2Practice 11.2
               Maximize pump unit bearing bracket oil change intervals  expose the plant to additional maintenance, shutdowns
               by using the principles of component condition monitoring  and do not increase reliability.
               (CCM) to extend pump bearing bracket oil change intervals  Comparison of pump MTBFs before and after bearing bracket oil
               from 13 weeks to as much as 104 weeks.              change intervals were increased from 13 weeks to over 100 weeks
                  The principle of component condition monitoring addresses the five  shows higher MTBFs for the extended interval pumps.
               major components of any type of machinery to completely monitor its
               condition. (See B.P. 10.11 supporting material for details.)  Benchmarks
                  Using these principles to trend rotor performance, bearing, seal and  This best practice has been recommended since the late 1990s,
               auxiliary system conditions, clients have extended the previous 13  following experience with a number of refinery machinery reliability
               week oil change out time in 13 week intervals from 13 to 104 weeks!  audits. Since that time, this best practice has produced pump MTBFs
                  The savings in manpower and materials was tremendous and the  in excess of 100 months where they were less than 48 months prior to
               exposure to reliability issues was significantly reduced.  the extension of oil change intervals.
               Lessons Learned
               13 or 26 week pump unit bearing bracket oil change
               intervals, when all component parameters are acceptable,
              B.P. 11.2. Supporting Material
              See B.P:11.1 for supporting material.
               Best
               Best Practice 11.3Practice 11.3
               Optimize pump unit component MTBFs by changing over    ‘New spare’ philosophy e operate started pump for four hours and
               pumps every 3 to 6 months to minimize pump start-ups  ‘CCM’ this pump unit
               while ensuring stand-by pump unit availability.
                  Excessive pump start-ups expose components (especially me-  Lessons Learned
               chanical seals) to reduced MTBFs.
                  Most plants do not have or follow a specified pump changeover  Plants that do not have an active and monitored pump
               program. Many plants change over pumps frequently (as often as once  changeover  program  experience  significantly  lower
               per week) while other plants do not change over pumps on a regular  MTBFs.
               basis.                                                I have never visited a plant where I was not asked my opinion of
                  We recommend that a pump changeover program be developed,  pump changeover philosophy.
               based on site pump wear experience. With the exception of firewater  Discussion always resulted in a recommendation consistent with
               (mandatory weekly operation) and seawater (frequent operation to  the information in this B.P.
               control corrosion) we recommend:                      Unfortunately, follow-up usually has shown mixed results in
                 The program initially require three month interval changeover  implementation of the recommendations.
                 The three month interval be extended month by month based on
                  pump CCM (see B.P.10.11)                         Benchmarks
                 The length of operation of the started pump be determined by:  This best practice has been recommended to all plants visited
                 Pump driver e if the main pump is steam turbine driven to prevent  since the late 1980s. Where it has been followed, plant pump MTBFs
                  electrical shutdowns and the started pump is motor driven e  have increased. There is an example of pump MTBFs being increased
                  operate for four hours and ‘CCM’ this pump unit  from less than 36 months to over 70 months in a process unit where
                 Plant spare pump philosophy:                      the changeover program results are continuously monitored and
                 Equal wear philosophy e operate started pump for changeover  implemented.