Page 232 - Fundamentals of Magnetic Thermonuclear Reactor Design
P. 232

214     Fundamentals of Magnetic Thermonuclear Reactor Design
                 TABLE 7.1 Expected Operating Conditions of the ITER In-Chamber Components (EDA Phase, 2001) (cont.)
                       Start-up limiter Baffle (the upper part of   Divertor   Divertor liner the divertor vertical target) vertical target  6  5  4  3  10 17 –10 18  10 17 –10 18  10 18 –10 20  10 17 –10 18  ∼10  ∼100  ∼100  ∼100  <0.1  <1  ∼5  0.5  ∼500/3–8 ∼500/3–8  ∼500/3–8  2300/2  No/±5 Short term/±1  Yes/± (1–3)  Yes/±0.5  3 (Cu)  5 (C






                       First wall  2  10 16 –10 17  ∼100  < 0.5  4600/-  Short   term/±2  0.78  4.6 (Be)  7.3 (Cu)  Be










                       Operation conditions  1 Quasi-stationary particleflux parameters  Ion/c-x neutral flux density   (cm −2  s −1 )    Particle flow energy (eV)  Expected surface erosion rate   (mm/year 1 ) Projected hours of operation till  replacement/tolerable number of   replacements Immediate contact with plasma/   limited position er