TABLE 4.3 Input Values for Calculating ALDT

                Percent of spares available at system location  95%
                Time required to obtain spare at system location  2 hours
                Time required to obtain spare from other location  72 hours
                Operational availability for required support equipment  98%
                Delay time when support equipment is not available  48 hours
                Average time for personnel to arrive to start maintenance  1 hours
                Average time waiting to enter maintenance facility  2 hours
                Average time waiting for transport to maintenance facility  0.5 hour
                Average ADT while non-mission-capable      4 hours


















                      FIGURE 4.10  Calculating ALDT.



















                   FIGURE 4.11  Calculating ALDT.


               Total time = 20 aircraft × 8760 possible operating hours per year = 175,200

               NMCT = 576 hours + 7800 hours + 2102.4 hours = 10,478.4
                       (TCM)    (TPM)     (ALDT)
                  175,200 − 10,478.4
               A O  =            = 0.94 = 94%
                      175,200
             FIGURE 4.12  Calculating A O .