Page 99 - Global Project Management Handbook
P. 99

TOTAL LIFE-CYCLE SYSTEM MANAGEMENT          4-7

                                 MCT = total time − NMCT
                                      Therefore,
                                   total time − NMCT
                           A  =
                            O
                                      total time
                           where MCT = mission-capable time
                                   NMCT = non-mission-capable time

                         FIGURE 4.6  Operational Availability.




                NMCT = TCM + TPM + ALDT
                NMCT consists of
                 TCM = total corrective maintenance downtime when the system is
                             undergoing repair because it failed
                 TPM = total preventive maintenance downtime when the system is
                             undergoing scheduled maintenance which renders it NMC
                ALDT = administrative or logistics delay time when the system is NMC
                             because it is awaiting logistics support resources (spares,
                             personnel, etc.)
               FIGURE 4.7  Non-mission-capable time.






                number of systems × number of annual missions × mission time
         TCM =                                              × M CMT
                                    MTBF

                     Number of systems = the total number of systems the user can task perform a mission
         Number of annual missions = the total number of times that a mission is performed
                                Mission time = the average time required to perform the mission once

         Example: Number of systems (aircraft) = 20 (total number in the operational inventory)
                         Number of annual missions  = 180 (total sorties per year per system)
                         Mission time                          = 8 hours
                         MTBF                                   = 200 hours
                         M CMT                                     = 4 hours


                20 × 180 ×  8
         TCM =            × 4 = 576 hours
                   200


        FIGURE 4.8  Calculating TCM.
   94   95   96   97   98   99   100   101   102   103   104