Page 405 - Hydrocarbon Exploration and Production Second Edition
P. 405
392 Managing the Subsurface
Figure 16.6 Upwards recompletion of a well.
Figure 16.7 Downwards recompletion of a well.
Monitoring of the tubing condition to track the rate of corrosion may be
performed to anticipate tubing failure and allow a tubing replacement prior to a
leak occurring.
The tubing string design should minimise the restrictions to flow. Monobore
completions aim at using one single conduit size from the reservoir to the tubing head