Page 405 - Hydrocarbon Exploration and Production Second Edition
P. 405

392                                                    Managing the Subsurface




























          Figure 16.6  Upwards recompletion of a well.






























          Figure 16.7  Downwards recompletion of a well.

          Monitoring of the tubing condition to track the rate of corrosion may be
          performed to anticipate tubing failure and allow a tubing replacement prior to a
          leak occurring.
             The tubing string design should minimise the restrictions to flow. Monobore
          completions aim at using one single conduit size from the reservoir to the tubing head
   400   401   402   403   404   405   406   407   408   409   410